Take a look at some of the recent building, extension, and landscaping projects we have completed across Fareham, South Hampshire, and West Sussex. Click any image to view it in full screen.
• Wickham, Hampshire
Premium Engineered Oak Installation
The homeowners wanted to replace outdated carpets and cracked tiles with a seamless, continuous wooden floor flowing from their hallway straight through to the open-plan kitchen. Upon lifting the old floors, we discovered significant height variations and loose, squeaky timber joists between the rooms.
Our flooring specialist, Richard, focused first on the foundation, stabilising the joists and pouring a self-levelling compound to create a perfectly flat base. We then laid 120 square metres of premium engineered European oak. To ensure a truly high-end finish, we undercut all the period door frames and carefully refitted the original skirting boards, completely avoiding the need for unsightly scotia beading. The result is a flawless, highly durable floor that instantly transformed the home.
Material
Brushed & Oiled Engineered European Oak (190mm wide planks)
Preparation
Joist stabilization & latex self-levelling screed
Key Feature
Seamless flow through four rooms with zero transition bars
Duration
7 Days (including subfloor prep and acclimatisation)
• West Sussex
Period Cottage Full Refurbishment & Structural Repair
This aging period cottage required a complete top-to-bottom transformation after falling into severe disrepair. Upon stripping back the dilapidated kitchen, bathroom, and flooring, we uncovered extensive hidden water damage and severe dry rot that had heavily compromised the structural floor joists.
Before any cosmetic updates could happen, Dino completely rebuilt the subfloor and replaced the rotting timbers to ensure the property was structurally safe. With the foundations secured, we carried out essential exterior brickwork and render repairs, fully re-plastered the interior walls for a glass-smooth finish, and installed a beautiful, modern shaker-style kitchen complete with sleek marble-effect tiling. The property was successfully rescued from ruin and brought back to life as a safe, modern, and welcoming home.
Scope of Works
Full property renovation, structural timber replacement, interior re-plastering, exterior brickwork repair, and complete kitchen installation.
Key Challenge
Identifying and rectifying extensive, hidden water damage and rotting structural joists.
Kitchen Finish
Contemporary grey shaker cabinetry with custom worktops and a premium marble-effect tiled backsplash.
Lead Builder
Dino (Dino's Designs)
• Hayling Island, Hampshire
Structural Knock-Through & Custom Media Wall
The clients wanted to modernize their home by opening up two separate living areas into one large, bright, open-plan space. We began by safely supporting the upper floor with Acrow props before removing the dividing load-bearing masonry wall. A heavy-duty steel RSJ beam was installed to secure the structure.
Once the structural work was signed off, we boxed in the steelwork and plastered the opening to create a seamless transition between the rooms. To complete the transformation, we designed and built a bespoke, wood-slatted media wall featuring integrated backlighting, a flush-mounted TV, and a modern electric fireplace. Finally, new hardwood flooring was laid to perfectly unify the newly created space.
Scope of Works
Load-bearing wall removal, RSJ steel beam installation, structural making-good, plastering, custom carpentry, and flooring.
Key Feature
Bespoke acoustic-slat media wall with an integrated modern fireplace.
Preparation
Heavy-duty Proplex floor protection and dust management used throughout the messy structural phase to protect the client's home.
Lead Builder
Dino
• Hayling Island, Hampshire
Bespoke Dentist Studio Built & Equipment Installation
This project involved the complete design and build of a bespoke dental surgery, creating a professional treatment space from the ground up.
From the initial construction and fit-out through to the installation of specialist dental equipment, every stage was completed to provide a modern, high-quality clinical environment ready for patients.
Scope of Works
Construction of a bespoke dental surgery, partitioning, plumbing, electrical installation, specialist finishes and full dental equipment installation.
Key Feature
A fully functional, modern dental treatment room complete with integrated chair, lighting and specialist clinical equipment.
Preparation
Careful planning and phased installation ensured minimal disruption while maintaining a clean, safe working environment throughout the build.
PROJECT DURATION
Approximately 3 weeks
Have a Project in Mind?
Whether you're planning a new extension, a kitchen installation, or hard landscaping, we'd be happy to discuss your ideas and provide a free quotation.
We reply within 24 hours or Find Us
Fareham, Hampshire
Covering all of Hampshire & beyond